Building energy infrastructure

Intelligent energy
for a sustainable future

We operate photovoltaic power plants and BESS battery storage systems in the Sturovo Industrial Park. We are preparing the construction of a data center powered by clean energy.

BESS containers in the Sturovo Industrial Park
0 MWh
BESS 1 Capacity
0 MWh
BESS 2 Capacity
0 MW
FVE 1
0 MW
FVE 2
Why BioEner?

Comprehensive Energy Infrastructure

Our Solutions kombinujú výrobu energie z obnoviteľných zdrojov s inteligentným ukladaním a distribúciou priamo do siete.

BESS Battery Storage

Standalone battery storage systems with a total output of 12.4 MW connected directly to the distribution grid. LiFePO4 technology by Pylon Technologies.

Photovoltaic Power Plant

Solar power plant with a total installed capacity of 23,975 MW ensuring clean energy production. Phase 1 (14,975 MW) and Phase 2 (9 MW).

Data Center

We are preparing the construction of a data center powered by our own renewable energy sources with maximum energy efficiency.

Battery Storage

Intelligent Energy Storage

Our battery storage systems are connected directly to the distribution grid and are primarily used for price arbitrage, grid stabilization, and optimization of energy flows.

Phase I - Operational, Commissioned
4 × 1,6 MW = 6,4 MW

Four stationary battery systems with a capacity of 3.344 MWh. Pylontech L3300-OMNI battery cells, Sinexcel inverters.

Phase II - Completion 10/2026
3 + 3 MW = 6 MW

Two containerized battery storage systems with a total capacity of 12.540 MWh. Construction completion 10/2026. Functional tests 11/2026.

More about BESS technology
BESS battery storage
Solar Energy

23,975 MW of Clean Energy

Our photovoltaic power plant provides long-term price hedging and significant Scope 2 carbon emissions reduction for all consumers in the industrial park.

The PV plant effectively reduces electricity costs for companies in the industrial park while also lowering their carbon footprint.

14,975 MW
Phase 1 - Operational, Commissioned
9 MW
Phase 2 - Functional Tests in Progress
More about solar energy
Photovoltaic power plant
Energy Hub

Energy Hub for Data Center

The Sturovo Industrial Park is building a comprehensive energy ecosystem with 100 MW+ capacity designed to power a data center running on renewable sources. The combination of our own photovoltaic power plant, battery storage systems, and planned expansion creates a unique energy platform in Central Europe.

Solar Energy
Existing: 24 MW Photovoltaic Power Plant
Planning: expansion by 6 MW (2028)
Power Supply
Voltage Level: 110 kV / 22 kV / 6.3 kV
Existing: Electricity Production 50 MW
Planning: 100 MW+ (2030)
Battery Energy Storage (BESS)
Existing: 12.4 MW (6.4 MW + 6 MW)
Planning: expansion by 10 MW (2028)
Gas Turbine Power Plant
Capacity: 70 MW (2 × 35 MW)
Timeline: 2028 – 2030
More About the Project
Energy Hub for Data Center in the Sturovo Industrial Park

Interested in Cooperation?

We are looking for investors and partners for the development of energy infrastructure and data center construction.