Skip to main content

For Investors

Investment opportunities in energy infrastructure and data centers in southern Slovakia.

Data center visualization with energy infrastructure
Investment Opportunity

Energy Infrastructure as the Foundation for Growth

BioEner Slovakia is building comprehensive energy infrastructure in the Sturovo Industrial Park. The existing photovoltaic power plant (23,975 MW) and battery storage systems (12.4 MW) form the foundation for further development, including the construction of a data center powered by our own renewable sources.

We are looking for strategic investors and partners who share our vision of sustainable energy and want to participate in projects with long-term return potential.

Investment growth and energy infrastructure
Key Parameters

Infrastructure in Numbers

12,4 MW

BESS Battery Storage

Phase I (6.4 MW) operational, commissioned. Phase II (6 MW) completion 10/2026, functional tests 11/2026. LiFePO4 technology, grid connection.

23,975 MW

Photovoltaic Power Plant

Phase I (14,975 MW) operational, commissioned. Phase II (9 MW) nearing completion – functional tests in progress. Long-term price hedging and emissions reduction.

Data Center

Planned Project

Construction of a data center powered by our own renewable sources. Seeking investor for project realization.

Štúrovo

Strategic Location

On the Danube, at the Hungarian border. Industrial park with its own distribution system and transport infrastructure.

Vision

Data Center Powered by Clean Energy

We plan to build a modern data center directly in Industrial park Sturovo, s.r.o. Thanks to our own photovoltaic power plant and battery storage systems, we can ensure power supply from 100% renewable sources.

BESS battery storage systems also serve as a backup power source, increasing power supply reliability and reducing the need for diesel generators.

This project represents a unique opportunity to enter the rapidly growing data center market in Central Europe.

Future data center visualization
Energy Hub

Energy Hub for Data Center

The Sturovo Industrial Park is building a comprehensive energy ecosystem with 100 MW+ capacity designed to power a data center running on renewable sources. The combination of our own photovoltaic power plant, battery storage systems, and planned expansion creates a unique energy platform in Central Europe.

Solar Energy
Existing: 24 MW Photovoltaic Power Plant
Planning: expansion by 6 MW (2028)
Power Supply
Voltage Level: 110 kV / 22 kV / 6.3 kV
Existing: Electricity Production 50 MW
Planning: 100 MW+ (2030)
Battery Energy Storage (BESS)
Existing: 12.4 MW (6.4 MW + 6 MW)
Planning: expansion by 10 MW (2028)
Gas Turbine Power Plant
Capacity: 70 MW (2 × 35 MW)
Timeline: 2028 – 2030
More About the Project
Energy Hub for Data Center in the Sturovo Industrial Park

Interested in Our Investment Opportunities?

Contact us for detailed information about cooperation and investment options.